CAMU Cell No. 3

DelHur was contracted to construct a Corrective Action Management Unit (CAMU) cell for the treatment, storage, and disposal of refinery waste. The project consisted of subsurface preparation; the installation of Geosynthetic Clay Liner, Geomembrane, and Geocomposite; the installation of a leachate collection system with associated piping; the placement of a screened operations layer over the liner system; and the construction of an embankment to establish site drainage.