INL – Remote Handled Low-Level Radioactive Waste Storage Facility

2024-03-07T12:16:35-08:00

Idaho National Laboratory – Remote-Handled Low-Level Waste Facility Design/Build AREVA Federal Services for Battelle Energy Alliance, LLC Department of Energy – Idaho National Laboratory – Idaho Falls, ID 2019 ENR/Mountain States Best Projects Award Winner Award of Merit - Safety Award of Merit - Specialty Construction View the ENR article 2019 Project Management Institute [...]

Construction of the WCS Low Level Radioactive Waste Facility

2016-10-18T19:10:26-07:00

Construction of the WCS Low Level Radioactive Waste Facility Waste Control Specialists, LLC Andrews, Texas DelHur was contracted to perform a massive expansion of the WCS Low-Level Radioactive Waste (LLRW) disposal facility (150-acres) located near Andrews, Texas. The project included the construction of two disposal cells, one for the disposal of commercial waste and the [...]

Finley Buttes – Cell 8A

2024-03-13T10:47:04-07:00

Finley Buttes - Cell 8A DelHur constructed a new disposal cell and access road at the facility.  Major elements included waste excavation; subgrade excavation and stockpile; stormwater culvert removal and backfill; engineered fill; final subgrade preparation; gravel access road construction; cell connections and terminations; HDPE piping; installation of geosynthetic liner system; placement of protective [...]

CRLRC – Module 15

2019-07-19T15:18:08-07:00

CRLRC - Module 15 New cell construction.  Major work included excavation, hauling, stockpiling, compost pad construction, perimeter road construction, fill placement, stormwater detention pond construction, rock quarry setup, surface preparation, trenching, aggregate production and placement, leachate monitoring system construction, piping, berm construction, installation of concrete slope protection, revegetation, and installation of permanent erosion control matting.

Go to Top